Skip to content
tempa
Menu
Evidence

Every figure on this site, with its source.

47 rows. Each one links to where the number comes from and says when we checked it (3 Nov 2026). Pages link here instead of restating sources. Nothing on this page is a customer result; modelled examples are marked as such.

The NHS estate
FigureWhat it isSourceAccessed
NHS maintenance backlog
£15.9bn, up 15.7 % in a year
#eric-backlog
Cost to eradicate the maintenance backlog across the NHS estate in England, ERIC 2024/25.3 Nov 2026
NHS estate running costs
£14.0bn
#eric-running-costs
Total cost of running the NHS estate in England, ERIC 2024/25.3 Nov 2026
NHS estate energy
11.3bn kWh
#eric-energy
Energy consumed by the NHS estate in England, ERIC 2024/25.3 Nov 2026
High-risk backlog
£3.5bn, up 27.8 %
#eric-high-risk
The high-risk share of the backlog, where failure could cause catastrophic harm or major disruption, ERIC 2024/25.3 Nov 2026
Estates-failure incidents
7,966 incidents, 1,584 critical, 14,596 clinical hours lost
#eric-incidents
Clinical service incidents caused by estates and infrastructure failure in 2023/24.
The party’s analysis of ERIC data, not an NHS publication.
3 Nov 2026
Great British Energy and the NHS
£100m, 132 solar and battery projects, 78 trusts
#gbe-nhs
Great British Energy funding for NHS trusts to install solar panels and battery storage, March 2025.3 Nov 2026
Battery replacing a UPS in the NHS
A battery system replacing a UPS at a South Yorkshire NHS hospital
#powerstar-nhs
An energy-storage vendor’s account of a hospital installation.
Vendor article, undated.
3 Nov 2026
Duties and standards
FigureWhat it isSourceAccessed
HTM 06-01
Clinical risk grades A–E; primary, secondary and tertiary supplies; generators “maintained in an operational readiness state”
#htm-06-01
Health Technical Memorandum 06-01, electrical services supply and distribution, NHS England.3 Nov 2026
NHS EPRR core standards
Business impact analysis and an annual board statement
#nhs-eprr
NHS core standards for emergency preparedness, resilience and response.3 Nov 2026
UKHSA Green Book, chapter 3
“arrangements should be in place for back-up facilities”
#green-book
Storage, distribution and disposal of vaccines, UKHSA Green Book chapter 3.3 Nov 2026
UKHSA cold-chain poster, 2026
“Have backup storage for your vaccines in case of power failure”
#ukhsa-cold-chain-poster
UKHSA cold-chain poster for vaccine storage, 2026 edition.3 Nov 2026
Vaccine wastage
£6.4m at list price; 84 % avoidable; 64 % of incidents cold-chain failures; 13 % “unavoidable (cold chain failure, for example: power cut)”
#ukhsa-vaccine-wastage
UKHSA figures for vaccine wastage reported in 2025, Vaccine Update issue 369, February 2026.3 Nov 2026
GP practices in England
6,229 (July 2025)
#gp-practices
Number of GP practices in England.3 Nov 2026
Community pharmacies in England
11,098 (2024/25)
#pharmacies
Number of community pharmacies in England.3 Nov 2026
Storms, outages and the grid
FigureWhat it isSourceAccessed
Storm Arwen, 2021
Over 1 million customers off; about 4,000 for more than a week; 13 days to full restoration; £29.64m compensation
#storm-arwen
Ofgem’s final report on the network operators’ response to Storm Arwen, June 2022.3 Nov 2026
Storm Éowyn, 2025
Almost 300,000 customers off in Scotland; six days to full restoration
#storm-eowyn
Restoration of supply after Storm Éowyn.3 Nov 2026
North Hyde: who is critical
Networks “do not know whether their customers are classified as CNI”
#north-hyde
The government’s response to NESO’s report on the North Hyde substation fire.3 Nov 2026
North Hyde: backup and priority restoration
CNI sectors expected to invest in backup power; a priority-restoration law under consideration
#north-hyde-response
Commitments in the government’s response to NESO’s North Hyde report.3 Nov 2026
Ofgem ED3 climate resilience
Reliability metrics “exclude the most severe events, which can give false reassurance”
#ofgem-ed3
Ofgem’s ED3 sector-specific methodology consultation, climate-resilience metrics annex, October 2025.3 Nov 2026
DNO-loaned battery packs
20,000 EcoFlow Delta 3 packs to medically dependent customers (February 2026)
#ssen-packs
SSEN’s home battery pack programme for customers who need the most support.3 Nov 2026
Met Office warnings feed
National Severe Weather Warning Service public API
#feeds-met-office
Machine-readable severe weather warnings used by storm mode.3 Nov 2026
UK Power Networks live power cuts
Open dataset of live faults
#feeds-ukpn
Live power-cut data for the UKPN area, used by storm mode.3 Nov 2026
National Grid Electricity Distribution live power cuts
Open dataset of live faults
#feeds-nged
Live power-cut data for the NGED area, used by storm mode.3 Nov 2026
SSEN real-time outages
Real-time outage dataset
#feeds-ssen
Live outage data for the SSEN area, used by storm mode.3 Nov 2026
Flexibility markets
FigureWhat it isSourceAccessed
Demand Flexibility Service, winter 2024/25
1.98m sign-ups; 3,917.7 MWh over 44 events; £1.23m of accepted tenders
#neso-dfs
NESO’s summary of the Demand Flexibility Service last winter.3 Nov 2026
Redesigned Demand Flexibility Service, 2026
Live 9 April 2026; 0.1 MW minimum; turn-up as well as turn-down; 130 events worth about £40m; 6.28 % of requirements filled
#dfs-2026
NESO’s Q3 2026 demand-side flexibility route-to-market quarterly update.3 Nov 2026
DNO flexibility tenders, 2022/23
4.6 GW tendered; 1.9 GW contracted
#dno-flexibility
Great Britain’s distribution network operators’ flexibility procurement in 2022/23.3 Nov 2026
NGED long-term flexibility tender, 2026
196 GWh awarded, including 52 GWh of FlexUp across 23 zones (February 2026)
#nged-flexup
National Grid DSO’s largest long-term flexibility tender to date.3 Nov 2026
SIF: hospital flexibility and resilience
SSEN with NHS Tayside and NHS England; Alpha phase about £500k
#sif-fortress
An Ofgem Strategic Innovation Fund project on hospital flexibility and resilience.3 Nov 2026
Standby generators earning reserve revenue
Two 800 kW standby generators earn reserve revenue through on-load tests
#flexitricity-ruh
Flexitricity case study at the Royal United Hospital, Bath.3 Nov 2026
Residential battery fleets as grid assets
$1bn Series D at a $13bn valuation; fleet over 500 MWh (August 2026)
#base-power
Base Power’s funding round, reported by Mercom.3 Nov 2026
Refrigeration energy
FigureWhat it isSourceAccessed
UK food cold-chain refrigeration
about 28.6 TWh per year
#cold-chain-twh
Baseline electricity use of refrigeration in the UK food cold chain.3 Nov 2026
Retail refrigeration
about 3.28 TWh per year, about 1 % of UK electricity
#retail-refrigeration
Electricity used by refrigeration in UK retail.3 Nov 2026
Pharmacy fridge consumption
Labcold RLDG0124 1.53 kWh/24 h; RLDF1819 1.56 kWh/24 h — about 65 W average, roughly 12 hours per usable kWh for one fridge
#labcold-draw
Manufacturer datasheet figures used to size a protected circuit; the hours-per-kWh figure is arithmetic on them.
Datasheet figures; runway is confirmed per asset in a trial.
3 Nov 2026
The modelled energy example on this site
12 cabinets, about 1,200 kWh per cabinet per year, 2 °C of overcooling, 2–3 % of compressor energy per °C, 27.5 p/kWh
#modelled-energy-example
The assumptions behind the worked example on the home page and the energy solution page. They are Tempa’s own assumptions for an illustration, not a customer result and not a market statistic.
Modelled example; labelled as such wherever it appears.
3 Nov 2026
Hardware and list prices
FigureWhat it isSourceAccessed
Tempa pilot kit, hardware cost
about £470 including UK VAT (about €448 ex VAT)
#parts-pilot-kit
One indoor gateway, four probe sensors, one door sensor and one current converter with clamps, at EU distributor list prices.
Sum of list prices at the time of checking; estates are quoted.
3 Nov 2026
Probe sensor specification
±0.5 °C typical; over 3,000 timestamped records stored on the device
#sensor-lht65n
Manufacturer specification of the Dragino LHT65N temperature and humidity sensor with an external probe.3 Nov 2026
EcoFlow Delta Pro 3
£2,799 including VAT; 4.1 kWh LiFePO4; 10 ms UPS switchover; developer API
#parts-ecoflow-delta-pro-3
Portable battery with UPS mode, list price at a UK retailer.3 Nov 2026
Victron MultiPlus-II 48/3000
£455 ex VAT
#parts-victron-multiplus
Inverter-charger with open Modbus, MQTT and VRM access, list price at a UK retailer.3 Nov 2026
Pylontech US5000
£1,266 including VAT; 4.8 kWh
#parts-pylontech-us5000
Lithium battery module, list price at a UK retailer.3 Nov 2026
Victron Cerbo GX
£203
#parts-cerbo-gx
System controller for Victron equipment, list price at a UK retailer.3 Nov 2026
Milesight CT101 current transformer
£72
#parts-ct101
LoRaWAN current transformer for generator run detection, list price at a UK distributor.3 Nov 2026
Dragino LDDS75 distance sensor
€76
#parts-ldds75
LoRaWAN ultrasonic level sensor for fuel tanks, list price at an EU distributor.3 Nov 2026
Tekelek TEK 766 level sensor
€177
#parts-tek766
LoRaWAN level sensor for fuel and water tanks, list price at an EU distributor.3 Nov 2026
Companies in the same ladder
FigureWhat it isSourceAccessed
Checkit plc
FY26 revenue £13.7m; ARR £14.3m; formal sale process since 26 March 2026
#checkit
Regulatory news from the UK-listed monitoring company with NHS customers.
Link is to the RNS service; search for Checkit plc.
3 Nov 2026
Eupry
Series A over DKK 170m (about €23M), December 2024
#eupry
Investment in the Danish compliance-monitoring company.3 Nov 2026
GlacierGrid (formerly Therma)
$19M Series A announced 7 February 2023; over 5,000 locations (September 2026); a $20/month subscription with 4G included; a “save 10 %” claim backed by a savings guarantee estimated under IPMVP
#glaciergrid
The US refrigeration monitoring and control company’s funding, scale and public pricing.
The partnership release is linked at the publisher’s site; search for GlacierGrid and Scription.
3 Nov 2026

Found a figure on the site that is not here, or a source that has moved? Tell us through the contact page and we will correct it.