Sense, Shield, Shift, Map.

One ladder, one record. What is live, what is in trial, what is planned, and — in plain words — what is not built. Dates are plans. Readiness levels are our own assessment against the standard TRL scale.

Rung 1
live today

Sense

Compliance monitoring
What it is
LoRaWAN sensors, an append-only record, alerts that escalate until acknowledged, HACCP and medicines-storage reports with a fingerprint, datalog recovery after outages.
Readiness today
TRL 7 — system demonstrated in an operational-style environment (our assessment): the product runs end to end on a simulated estate; the first real sites are the pilot programme.
The evidence that moves it up
Pilot sites running for a full inspection cycle; an inspector accepting the record; sensor uptime and alert time-to-acknowledge measured on real estates.
When (a plan, not a promise)
Pilots open now.
Rung 2
in trial

Shield

Verified Survivable Hours and verified backup
What it is
A thermal model per cabinet, time to excursion, the outage board, the protected-load map, the resilience register and the evidence pack; Verified Survivable Hours as the one number.
Readiness today
TRL 5–6 — thermal models, the outage board, the backup register and the evidence pack exist in the product and are exercised on simulated data; the drill results on real cabinets are what the trial measures (our assessment).
The evidence that moves it up
The 16-week resilience trial: prediction error during statutory generator drills, the share of critical cold assets above the estate’s own threshold, loads found unprotected or mis-mapped.
When (a plan, not a promise)
Trial with NHS and Centrica-facing estates planned for 2027; the protected circuit and the generator readiness ledger join the trial the same year.
Rung 3
planned

Shift

Flexibility inside the measured envelope
What it is
Half-hourly prices and signals, a flexibility envelope per cabinet read off the same curve as the runway, a probe-emulation controller that lets the cabinet’s own thermostat do the switching, and later battery dispatch on protected circuits.
Readiness today
TRL 3 — the data model, the price feeds and the safety limits are designed; no control hardware exists and nothing is actuated (our assessment).
The evidence that moves it up
A working controller prototype on a bench; a cabinet held inside its envelope through a dispatch window with no excursion; a route to market where a 0.1 MW aggregate qualifies.
When (a plan, not a promise)
Controller prototype planned for the second half of 2027; any revenue share after that. No flexibility revenue exists today.
Rung 4
planned

Map

Demand-side criticality for networks and the system operator
What it is
Aggregated, consented data on where critical cold and clinical loads sit, how long they can last and what protects them, so networks and NESO can see demand-side criticality rather than guess at it.
Readiness today
TRL 2 — a concept with a data model behind it (our assessment).
The evidence that moves it up
Enough Shield estates to aggregate; a network control room willing to receive a ranked list during a fault; the live risk feed pilot.
When (a plan, not a promise)
Later; a live risk feed pilot is planned for 2027 at the earliest.
The seven offers

Each one lands on the same record.

Statuses as of 3 November 2026. The resilience page describes each in full, with the parts and prices on the evidence page.

OfferStatusWhat it does
Protected circuittrial 2027Off-the-shelf LiFePO4 battery UPS on the fridge circuit; runway reported as Verified Survivable Hours.
Storm modein buildMet Office warnings and live network faults trigger pre-cooling advice, backup checks, the runway to the named contact and an incident.
Generator readiness ledgertrial 2027Run detection, tank level and starter-battery voltage; automatic test records against HTM 06-01.
Outage playbookin buildKeep/shed order, protected circuits, fuel and battery allocation, who to call — printable and live.
Digital drillin buildA weekly simulated power cut on the models and the register; a one-page readiness statement with a trend.
Live risk feedplanned, pilot 2027Sites inside a fault ranked by time to harm, shared with the control room and the ICB.
Compressor healthplanned 2027Start-current trend, short-cycling and duty creep; needs a year of data.
Not built

So nobody has to guess.

  • Controller hardware of any kind: the probe-emulation controller is a design, not a device.
  • Any actuation: Tempa does not switch, set, pre-cool or dispatch anything today. Storm-mode actions are advice to staff.
  • The aggregation layer (Map): no data is shared with any network or system operator.
  • Battery dispatch, flexibility bidding or any flexibility revenue.
  • Native mobile apps in the stores: the Expo app exists in the repository and has not been run on a device.
  • UPS and generator telemetry adapters: readings for those channels exist in the data model; integrations are manual logging or planned.

The market context behind the plan — storms, the redesigned Demand Flexibility Service, the North Hyde response — is on the evidence page.